1

About Hardwood Floor

emmas631ipv6
A second coat will likely be advised for toughness, nonetheless, the moist film thickness of the very first topcoat will affect the dry time and also your ability to recoat. A standard recoat time is within three to 4 hrs—any more between topcoats will require extra sanding to have https://www.sequoiaflooring.net
Report this page

Comments

    HTML is allowed

Who Upvoted this Story